
2 Installation and connection
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
2-12
3 Check and start operation
3-1 The name and function for the operation and display
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
3-1
3
3 Check and start operation
3-1 The name and function for the operation and
display
3-1-1 Name of each part
< Enlarged view of the operation panel>
A
B
C
E
F
H
I
G
D
A: “Power supply output” LED
E: “Power” switch
B: “Battery mode” LED
F: “Up” switch
C: “Battery replacement” LED
G: “Down” switch
D: Liquid Cell Display
H: “ESC” switch
I: “Enter” switch
3-1-2 The meaning of each LED
Sign of
the figure
LED
Color
Name
Status
Lit.
Not lit.
A
Green
“Power supply
output” LED
The power supply output is
ON.
The power supply output is
OFF.
B
Orange
“Battery mode”
LED
Backup is operating. This
status is called “Battery
Mode”.
Backup is not operating.
C
Red
“Battery
replacement”
LED
Battery replacement is neces-
sary due to the battery deterio-
ration, the end of battery life, or
the end of UPS life.
Battery replacement is not
necessary.
Summary of Contents for BN100T
Page 2: ......
Page 24: ...1 Preparation BN50T BN75T BN100T BN150T BN220T BN300T 1 8...
Page 36: ...2 Installation and connection BN50T BN75T BN100T BN150T BN220T BN300T 2 12...
Page 54: ...3 Check and start operation BN50T BN75T BN100T BN150T BN220T BN300T 3 18...
Page 72: ...4 Maintenance and Inspection BN50T BN75T BN100T BN150T BN220T BN300T 4 18...
Page 88: ...6 Using the contact signal functions BN50T BN75T BN100T BN150T BN220T BN300T 6 8...
Page 94: ...8 Troubleshooting BN50T BN75T BN100T BN150T BN220T BN300T 8 4...
Page 96: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 2 2 FA OA 2 AC 50 60Hz AC AC...
Page 97: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 3 AC AC 3P 2P AC AC 5cm UPS UPS...
Page 99: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 5 1mA AC UPS AC UPS...
Page 109: ...Cut here...