
4 Maintenance and Inspection
4-2 Replacing the battery
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
4-12
7
.
Attach the front panel.
Attach the front panel to the unit. 1)
Use a screwdriver to securely tighten (clockwise) the 2 screws at the top of the front
panel. 2)
Tighten the 2 screws.
1)
2)
Battery replacement is now complete.
Notes
Be sure to reset the battery life counter after replacing the battery.
After replacing the battery, reset the battery life counter from the “Control” - “Reset
B.life counter” screen in the menu on the unit’s LCD.
If you do not reset the battery life counter, a battery replacement alarm may occur
earlier than the expected battery life.
Write the battery replacement date on the included battery replacement date
label, and attach the label to the unit.
Or, enter the battery replacement date from the “Setting” - “Battery Settings” - “Battery
Installation” screen in the menu on the LCD.
Summary of Contents for BN100T
Page 2: ......
Page 24: ...1 Preparation BN50T BN75T BN100T BN150T BN220T BN300T 1 8...
Page 36: ...2 Installation and connection BN50T BN75T BN100T BN150T BN220T BN300T 2 12...
Page 54: ...3 Check and start operation BN50T BN75T BN100T BN150T BN220T BN300T 3 18...
Page 72: ...4 Maintenance and Inspection BN50T BN75T BN100T BN150T BN220T BN300T 4 18...
Page 88: ...6 Using the contact signal functions BN50T BN75T BN100T BN150T BN220T BN300T 6 8...
Page 94: ...8 Troubleshooting BN50T BN75T BN100T BN150T BN220T BN300T 8 4...
Page 96: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 2 2 FA OA 2 AC 50 60Hz AC AC...
Page 97: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 3 AC AC 3P 2P AC AC 5cm UPS UPS...
Page 99: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 5 1mA AC UPS AC UPS...
Page 109: ...Cut here...