194
Preparing and Mounting Flat Connectors on the Cables
Section E-4
2-2 Hold the Cable to prevent dislocation. Close the cover to sandwich the
Cable.
3.
Pressure-welding the Connector
Use a DWT-A02 Special Tool (Pliers) to pressure-weld and connect the Cable.
3-1 Place the Connector on the pressure-welding block of the DWT-A02
Special Tool (Pliers). Align the Connector side faces with the datum
shown in the picture below (shaded faces). Thus the center (see
arrow) of the connector cover is aligned with the center of the
pressure-welding block on the Pliers.
3-2 Squeeze the Pliers firmly until the lock on the Connector clicks into
place.
Datum to place the
Connector
Special Tool (Pliers)
Connector cover
Summary of Contents for 3G8F7-CRM21
Page 4: ...iv...
Page 10: ...x TABLE OF CONTENTS...
Page 46: ...26 Connecting the Communications Power Supply Cables Section 2 4...
Page 74: ...54 Board Hardware Error Notification Section 4 8...
Page 173: ...153 APPENDIX D Sample Program D 1 Sample Program 154...
Page 230: ...210 Wiring for Power Supply Section E 5...
Page 234: ...214 Index...
Page 236: ...216 Revision History...
Page 237: ......