USG-400
ISSUE1 5-1
Inspection
Chapter 5 : Inspection
1
Verification
workflow ........................................................................5-2
2
Power
verification .............................................................................5-3
3
Verification of communication cable connection between
compatible electrosurgical generator and ultrasonic generator
(when using the THUNDERBEAT) ....................................................5-6
4
Verification of touch-screen and push buttons ..............................5-7
5
Verification of the THUNDERBEAT and/ or SONICBEAT..............5-10
6
Verification of footswitch connection............................................5-13
7
Verification of the high-frequency(RF bipolar) output
(when using the THUNDERBEAT) ..................................................5-13
8
Verification of the alarm system ....................................................5-17
9
Procedure
after
verification ..........................................................5-19
10
Inspection
check sheet...................................................................5-20
Summary of Contents for USG-400
Page 1: ...ISSUE 1 2011 11 MAINTENANCE MANUAL USG 400...
Page 2: ......
Page 6: ......
Page 10: ...USG 400 Product Outline 1 4 ISSUE1 4 System chart...
Page 11: ...USG 400 ISSUE1 2 1 Specifications Chapter 2 Specifications 1 Specifications 2 2...
Page 14: ......
Page 34: ......
Page 38: ......
Page 43: ...USG 400 ISSUE1 5 5 Inspection Figure 5 3 Figure 5 4...
Page 50: ...USG 400 Inspection 5 12 ISSUE1 Figure 5 12...
Page 59: ...USG 400 ISSUE1 6 1 Safety check Chapter 6 Safety check 1 Check procedures 6 2 2 Check Card 6 6...
Page 65: ...USG 400 ISSUE1 7 1 Block Diagram Chapter 7 Block Diagram 1 Block Diagram 7 2...
Page 89: ......