![Nuova Simonelli Appia II User Handbook Manual Download Page 41](http://html.mh-extra.com/html/nuova-simonelli/appia-ii/appia-ii_user-handbook-manual_1717927041.webp)
37
ENGLISH
6.4
MAKING
COFFEE
Unhitch the filter-holder and fill it with one or
two doses of ground coffee depending on the
filter used.
Fig. 21
Press the coffee with the provided coffee
presser, dust off any coffee residue from the rim
of the filter (this way the rubber gasket will last
longer).
Insert the filter in its unit.
Press the desired coffee button:
By starting up the coffee brewing procedure the
unit’s pump is activated and the unit’s solenoid
valve is opened.
By pressing it, the button will turn on and signal
the operation
1 small coffee
2 small coffees
1 long coffee
2 long coffees
CAUTION
RISK OF BURNS OR SCALDING
NOTE:
when in pause, leave the filter-holder
inserted in the unit so that it will keep
warm. To guarantee the utmost thermic
stability during use, the delivery units
are thermo-compensated with com-
plete hot water circulation.
To use steam just pull or push the provided
lever (Fig. 22).
By pulling it completely the lever will hold a
position of maximum delivery; by pushing it, the
lever will automatically give way.
The two steam nozzles are articulated to guar-
antee their easy use.
6.5
USING
STEAM
While using the steam nozzle, you must pay
attention to not place your hands beneath it
or touch just after it has been used.
6.6
MAKING
CAPPUCCINO
To obtain the typical cappuccino foam, immerse
the nozzle all the way into a container 1/3 full
6.7
HOT WATER
SELECTION
CAUTION
RISK OF BURNS OR SCALDING
While using the hot water nozzle, pay care-
ful attention not to place your hands
beneath it or touch it just after it has been
used.
This nozzle delivers hot water to make tea or
herb teas.
Place a container underneath the hot water
nozzle and press the switch (S model) or press
the hot water select button
(V model).
Make sure the button lights up.
Water will be delivered from the hot water noz-
zle for as long as the set time indicates.
NOTE:
Hot water can be delivered at the same
time as coffee.
of milk (preferably cone-shaped). Turn on the
steam. Before the milk starts to boil, pull the
nozzle slightly up and lightly move it vertically
across the surface of the milk. When you have
completed the procedure, clean the nozzle
carefully with a soft cloth.
NOTE
: Before using the steam wand, always
bleed out any condensation for at least
2 seconds or according to the manufac-
turer’s instructions.
Fig. 23
Fig. 22
Summary of Contents for Appia II
Page 2: ......
Page 8: ...4 ITALIANO ...
Page 26: ...22 ITALIANO NOTE ...
Page 30: ...26 ENGLISH ...
Page 48: ...44 ENGLISH NOTES ...
Page 52: ...48 FRANÇAIS ...
Page 70: ...66 FRANÇAIS NOTE ...
Page 71: ...67 ...
Page 72: ...68 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ELECTRIQUE Appia S 2 3 GR Fig 33 ...
Page 74: ...68 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ELECTRIQUE Appia V 2 GR Fig 34 ...
Page 76: ...68 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ELECTRIQUE Appia V 3 GR Fig 35 ...
Page 81: ...77 SCHEMA CALDAIA BOILER DIAGRAM SCHÉMA DE CHAUDIERE 3 gr 1 2 15 05 2013 90014770 ...
Page 82: ...68 NOTE ...
Page 83: ...79 NOTE ...
Page 84: ...68 NOTE ...
Page 85: ......
Page 88: ......
Page 94: ...4 DEUTSCH ...
Page 112: ...22 DEUTSCH HONWEIS ...
Page 116: ...26 ESPAÑOL ...
Page 134: ...44 ESPAÑOL NOTA ...
Page 135: ...45 ...
Page 136: ...46 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia S 2 3 GR Fig 33 ...
Page 138: ...46 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia V 2 GR Fig 34 ...
Page 140: ...46 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia V 3 GR Fig 35 ...
Page 142: ...46 Fig 36 1 2 3 6 4 5 7 9 11 14 15 8 HYDRAULIKANLAGE INSTLACIÓN HIDRÁULICA 10 16 12 13 3 ...
Page 146: ...46 NOTE ...
Page 147: ...45 NOTE ...
Page 148: ...46 NOTE ...
Page 149: ......