![Nuova Simonelli Appia II User Handbook Manual Download Page 36](http://html.mh-extra.com/html/nuova-simonelli/appia-ii/appia-ii_user-handbook-manual_1717927036.webp)
32
ENGLISH
Always quote the machine serial number in all
communications to the manufacturer, Nuova
Simonelli.
The machine is transported on a pallet with
other machines protected by cartons fastened
to the pallet by straps.
Prior to carrying out any transport or handling
operation, the operator must:
SXWRQZRUNJORYHVDQGSURWHFWLYHIRRWZHDU
as well as a set of overalls which must be
elasticated at the wrists and ankles.
The pallet must be transported using a suit-
able means for lifting (e.g., forklift).
CAUTION
RISK OF IMPACT OR CRASHING
CAUTION
RISK OF IMPACT OR CRASHING
During all handling operations, the operator
must ensure that there are no persons,
objects or property in the handling area.
The pallet must be slowly raised to a height
of 30 cm (11,8 in) and moved to the loading
area. After first ensuring that there are no
persons, objects or property, loading opera-
tions can be carried out.
Upon arrival at the destination and after
ensuring that there are no persons, objects
or property in the unloading area, the prop-
er lifting equipment (e.g. forklift) should be
used to lower the pallet to the ground and
then to move it (at approx. 30 cm (11,8 in)
from ground level), to the storage area.
Before carrying out the following operation,
the load must be checked to ensure that it is
in the correct position and that, when the
supports are cut, it will not fall.
The operator, who must first put on work
gloves and protective footwear, will proceed
to cut the supports and to storing the prod-
uct. To carry out this operation, the techni-
cal characteristics of the product must be
consulted in order to know the weight of the
machine and to store it accordingly.
3.
TRANSPORT AND HANDLING
3.1
MACHINE
IDENTIFICATION
3.2
TRANSPORT
3.3
HANDLING
Fig. 8
Summary of Contents for Appia II
Page 2: ......
Page 8: ...4 ITALIANO ...
Page 26: ...22 ITALIANO NOTE ...
Page 30: ...26 ENGLISH ...
Page 48: ...44 ENGLISH NOTES ...
Page 52: ...48 FRANÇAIS ...
Page 70: ...66 FRANÇAIS NOTE ...
Page 71: ...67 ...
Page 72: ...68 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ELECTRIQUE Appia S 2 3 GR Fig 33 ...
Page 74: ...68 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ELECTRIQUE Appia V 2 GR Fig 34 ...
Page 76: ...68 IMPIANTO ELETTRICO ELECTRIC SYSTEM INSTALLATION ELECTRIQUE Appia V 3 GR Fig 35 ...
Page 81: ...77 SCHEMA CALDAIA BOILER DIAGRAM SCHÉMA DE CHAUDIERE 3 gr 1 2 15 05 2013 90014770 ...
Page 82: ...68 NOTE ...
Page 83: ...79 NOTE ...
Page 84: ...68 NOTE ...
Page 85: ......
Page 88: ......
Page 94: ...4 DEUTSCH ...
Page 112: ...22 DEUTSCH HONWEIS ...
Page 116: ...26 ESPAÑOL ...
Page 134: ...44 ESPAÑOL NOTA ...
Page 135: ...45 ...
Page 136: ...46 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia S 2 3 GR Fig 33 ...
Page 138: ...46 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia V 2 GR Fig 34 ...
Page 140: ...46 ALEKTRISCHE ANLAGE INSTALACIÓN ELÉCTRICA Appia V 3 GR Fig 35 ...
Page 142: ...46 Fig 36 1 2 3 6 4 5 7 9 11 14 15 8 HYDRAULIKANLAGE INSTLACIÓN HIDRÁULICA 10 16 12 13 3 ...
Page 146: ...46 NOTE ...
Page 147: ...45 NOTE ...
Page 148: ...46 NOTE ...
Page 149: ......