
89
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Chapter 14
Cable routing and labeling
Route and label cables prior to connecting the cables to the processor cards,
termination panels, and far-end equipment to simplify your installation tasks.
•
“Prerequisites to cable routing and labeling” (page 89)
•
“Cable routing and labeling task flow” (page 89)
Prerequisites to cable routing and labeling
•
Ensure all cables comply with the appropriate cable specifications. For
more information about cable requirements, including pinouts, see
241-7401-200 Passport 7400 Hardware Description.
•
Before routing any cables, measure the exact distance that the cables will
follow and ensure all cables are long enough, with minimal slack
management. Also, ensure that cables are routed away from anything that
can damage the cable or affect its signals.
Cable routing and labeling task flow
This task flow shows you the sequence of procedures you perform to route
and label cables. To link to any procedure, go to “Task flow navigation”
(page 90).
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......