230 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Installing a BITS wire
Install a BITS wire from the site timing source to the BITS termination panel.
Prerequisites
•
Test the signal strength at the end of the connection from the site source
before connecting. The signal strength must be within the range indicated
in ITU-T G703 or ANSI TI.102.
•
If the signal is not within the range, fix the problem between the point of
test and the site source. Depending on the length of cable from the site
source, you may need a thicker gauge cable to ensure the signal strength.
Procedure steps
1
If they are not already connected, connect the BITS wires to the external
timing source.
2
At theBITS termination panel plug the connector (D-sub or coax) of the
timing wire (which you may have labeled as reference 0) into the
connector beside the label BITS 0 Rx. This wire will correspond on
Passport to the BITS 0 source and will be associated with the EE1/0 or
the EDS1/0 component.
3
For a redundant timing setup, plug the connector (D-sub or coax) of the
timing wire (which you may have labeled as reference 1) into the
connector beside the label BITS 1 Rx. This wire will correspond on
Passport to the BITS 1 source and will be associated with the EE1/1 or
the EDS1/1 component.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......