
330 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Removing a 3-slot Passport switch shelf
Remove a 3-slot Passport switch shelf to redeploy in another location or to
decommission.
Prerequisites
Remove the power cables and processor cards and disconnect cables from any
rear-mounted termination panels before removing the shelf.
Procedure steps
1
If the switch is installed in a rack or cabinet, have one person remove the
screws that fasten the front brackets to the rails of the rack or cabinet
while another person supports the chassis. Remove the brackets from the
chassis if no longer required. See the figure “Rack-mounting brackets on
3-slot Passport switch” (page 331)
2
If the switch is a vertical mount, remove the shelf plate, shelf assembly
and cable guide as show in the figure “Removing vertical mount shelf
hardware” (page 332).
3
If the switch is a desk-top mount, remove the feet and cable guide. See
the figures “Removing the feet on a desk-top mounted 3-slot Passport
switch” (page 333) and “Cable guide on desk-top mounted 3-slot
Passport switch” (page 235).
4
Remove any rear-mounted termination panels from the shelf, if no longer
required.
5
Pack the shelf in its original packaging.
CAUTION
Risk of equipment damage
You need two people to remove a 3-slot Passport switch
from a rack or cabinet: one person must hold the chassis
in place while a second person unfastens the screws.
CAUTION
Risk of damage to equipment by moving
When moving an uncrated cabinet or shelf assembly,
protect it from strain, shock, impact, and vibration. Lack
of protection can damage or warp the equipment.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......