
414 Chapter 37 Hardware procedures
241-7401-240 5.2S1
Unpacking a 3-slot Passport switch
Unpack a 3-slot Passport switch close to the installation site.
Prerequisites
•
Nortel ships mounting kits in separate boxes. Unpack your mounting kit
and place the parts to the side until you are ready to mount the chassis.
Procedure steps
1
Place the termination panel boxes to one side. Do not unpack them.
2
Set the box on the floor with the top end up.
3
Cut the tape that seals the top flaps, taking care not to cut into the
contents of the box, and fold back all four flaps.
4
Remove the foam from the top of the chassis.
5
Lift the chassis from the box and set it on the floor or table.
6
Remove the packing material from the chassis.
7
Unpack any other equipment that was delivered with the switch.
8
Compare the contents of your shipment with the table “Equipment
checklist for the 3-slot Passport switch base package” (page 415) and the
figure “Taking inventory after unpacking a 3-slot Passport switch”
(page 416) to ensure you have all the hardware you require.
CAUTION
Risk of electrostatic damage
To avoid electrostatic damage, do not unpack the
termination panels at this time. When handling processor
cards, always wear antistatic footwear or provide
equivalent protection to avoid electrostatic damage to
electronic parts.
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......