
Chapter 2 3-slot Passport switch shelf replacement 35
Passport 7400 Hardware Installation, Maintenance, and Upgrade 5.2S1
Figure 4
3-slot Passport switch shelf replacement task flow: part 2
Task flow navigation
•
“Removing power cables” (page 384)
•
“Removing a control processor” (page 360)
Yes
No
Install
another FP?
Installing a
function
processor
Installing a control
processor
Powering up a
3-slot Passport
switch
Installing function
processor cables
Unpacking a
3-slot Passport
switch
Installing dc power
cables in a 3-slot
Passport switch
Installing ferrite
beads onto dc
power cables
(optional)
Grounding a dc-
powered
3-slot Passport
switch
Select
mounting
option
Installing a 19"
rack-mounted
termination panel
(if necessary)
A
End
Testing a bus
(optional)
Card testing
(optional)
Testing ports
and interfaces
(optional)
Return the
shelf to service
after running all
tests
Installing a desk-
top mounted
3-slot Passport
switch
Installing a 3-slot
Passport switch in
a rack or cabinet
Installing a
vertical-mount
3-slot Passport
switch
Installing a 3-slot
Passport switch in
a seismic rack or
cabinet
Installing a 13"
termination panel
in a 3-slot
Passport switch
(if necessary)
PP_TASK_1024.ins
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......