34 Chapter 2 3-slot Passport switch shelf replacement
241-7401-240 5.2S1
•
Before you can replace a shelf, you must assemble enough anti-static
packaging and clear an area large enough to temporarily store all of the
processor cards. You also need to have appropriate packaging materials
so that you can store or ship the removed shelf. See “Unpacking a
processor card” (page 426) for FP and CP handling instructions.
•
Some of the procedures in this task are not located in this NTP. Ensure
you have access to the required NTPs.
3-slot Passport switch shelf replacement task flow
This task flow shows you the sequence of procedures you perform to replace
a 3-slot Passport switch. To link to any procedure, go to “Task flow
navigation” (page 35).
Figure 3
3-slot Passport switch shelf replacement task flow: part 1
Yes
No
3-slot
Passport
switch shelf
replacement
Remove
another FP?
Removing a
function
processor
Removing a
control processor
Removing a
3-slot Passport
switch
Removing power
cables
A
PP_TASK_1024.ins
Summary of Contents for Passport 7400
Page 1: ...Passport 7400 Hardware Installation Maintenance and Upgrade 241 7401 240 ...
Page 2: ......
Page 4: ......
Page 6: ...6 Publication history 241 7401 240 5 2S1 ...
Page 28: ...28 About this document 241 7401 240 5 2S1 ...
Page 32: ...32 Chapter 1 3 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 42: ...42 Chapter 3 5 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 60: ...60 Chapter 5 16 slot Passport switch installation 241 7401 240 5 2S1 ...
Page 66: ...66 Chapter 6 16 slot Passport switch shelf replacement 241 7401 240 5 2S1 ...
Page 74: ...74 Chapter 9 Alarm hardware replacement 241 7401 240 5 2S1 ...
Page 80: ...80 Chapter 11 BITS termination panel replacement 241 7401 240 5 2S1 ...
Page 84: ...84 Chapter 12 Cabinet installation 241 7401 240 5 2S1 ...
Page 88: ...88 Chapter 13 Cable replacement 241 7401 240 5 2S1 ...
Page 102: ...102 Chapter 18 Ethernet cable replacement 241 7401 240 5 2S1 ...
Page 106: ...106 Chapter 19 External timing addition 241 7401 240 5 2S1 ...
Page 110: ...110 Chapter 20 Failed FP cable replacement 241 7401 240 5 2S1 ...
Page 132: ...132 Chapter 25 Function processor decommissioning 241 7401 240 5 2S1 ...
Page 152: ...152 Chapter 32 Power cable replacement 241 7401 240 5 2S1 ...
Page 156: ...156 Chapter 33 Power supply addition 241 7401 240 5 2S1 ...
Page 160: ...160 Chapter 34 Power supply replacement 241 7401 240 5 2S1 ...
Page 412: ...412 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 436: ...436 Chapter 37 Hardware procedures 241 7401 240 5 2S1 ...
Page 437: ......