Replace Desiccant
Each X2-CB/X2-CBMC ships with a bag of desiccant inside the logger enclosure. This desiccant bag should be
replaced whenever:
1. The X2-CB/CBMC enclosure is opened.
2. The Internal Humidity diagnostic parameter reads 50% or greater.
Desiccant Replacement Process
1. Disconnect the 6-pin solar panel or UW-6 USB cable from the X2-CB SOLAR/COM port to remove power
from the data logger.
2. Remove the buoy solar tower to gain access to the data well [CB-150/250/450 buoys only].
a. Remove the (6) bolts with lock washers securing the solar tower using a 9/16″ socket wrench.
A71 desiccant kit.
Remove CB-150/250/450 solar
tower.
88
Summary of Contents for X2-CB
Page 11: ...Select sensors from drop down list 11...
Page 17: ...Cellular X2 C to WQData LIVE 17...
Page 18: ...Iridium X2 I to WQData LIVE 18...
Page 19: ...Radio to Cellular X2 RC to WQData LIVE 19...
Page 48: ...Iridium X2 data flow 48...
Page 94: ...Rotate the antenna bushing counterclockwise to remove the antenna 94...
Page 108: ...13 Remove the Main SD Card Main SD Card Location 108...