18. Place the re-assembled X2-CB back on top of the data well.
a. Make sure the primary data well O-ring is clear of debris and centered in the groove.
b. Reconnect the 6-pin plug on the bottom cable of the X2 logger to the battery harness cable in the datawell.
c. Align the plate and re-install the (8) 3/8-16×3/4 bolts and 3/8 lock washers, tightening them in a cross-
pattern using a 9/16 socket wrench.
Evenly tighten the enclosure back to the CB-plate.
Verify the data well O-ring is present and clear of debris.
113
Summary of Contents for X2-CB
Page 11: ...Select sensors from drop down list 11...
Page 17: ...Cellular X2 C to WQData LIVE 17...
Page 18: ...Iridium X2 I to WQData LIVE 18...
Page 19: ...Radio to Cellular X2 RC to WQData LIVE 19...
Page 48: ...Iridium X2 data flow 48...
Page 94: ...Rotate the antenna bushing counterclockwise to remove the antenna 94...
Page 108: ...13 Remove the Main SD Card Main SD Card Location 108...