7 - MAINTENANCE
Installation
RAIL17SSL0039BA
9
1
Slider glass
5
Fixed upper glass
2
Frame
6
Lower seals
3
Latch
7
Lower glass
4
Frame
Lower glass
1. Place the glass into the outer seal.
2. Starting at the front, bottom corner, press the lower seal
down into the frame all the way to the back.
3. Starting at the front, top corner, press the upper seal up
into the frame all the way to the back.
4. Starting at the top, press the front seal into the frame
all the way down to the bottom corner.
Fixed upper glass
5. Place glass back into the frame and slide into rearward
position just as it was removed.
6. Press the outer PVC channel down into the frame until
it snaps in place.
Slider glass
7. Press the front, inner PVC channel down into the frame,
sliding it forward as far as possible.
8. Place the slider glass into the track and push forward
until latched.
9. Press the front edge of the last PVC channel down into
the frame just behind the slider glass until and push
forward until it meets the front PVC channel underneath
the glass.
10. Press the channel down into the frame working from
front to back until it snaps into place.
7-80
Summary of Contents for 200 Series
Page 60: ...2 SAFETY INFORMATION 2 44 ...
Page 130: ...3 CONTROLS AND INSTRUMENTS 3 70 ...
Page 154: ...5 TRANSPORT OPERATIONS 5 14 ...
Page 184: ...7 MAINTENANCE L213 and L215 machines with Electro Hydraulic EH controls 47946332B 6 7 20 ...
Page 250: ...7 MAINTENANCE 7 86 ...
Page 288: ...10 ACCESSORIES 10 2 ...