5 - TRANSPORT OPERATIONS
1. Connect all slings to a single point
(1)
on the suitable
craning equipment above the cab.
2. Attach chains to the machine’s rear lifting points
(2)
on
the machine.
RAIL14SSL0412BA
22
3. Route the front sling down the right-hand side of the
Roll Over Protective Structure (ROPS).
RAIL14SSL0410BA
23
4. Route the front sling down the outside of the ROPS
front pivot point
(1)
and attach to the machine’s right-
hand side lifting point
(2)
.
5. Repeat on the left-hand side of the machine.
6. Clear the area.
7. Lift the machine just off the ground. The machine
should stay level. If it is not level lower the machine
to the ground and adjust the length of the rear chains.
Repeat until you achieve a level lift.
RAIL14SSL0400BA
24
5-11
Summary of Contents for 200 Series
Page 60: ...2 SAFETY INFORMATION 2 44 ...
Page 130: ...3 CONTROLS AND INSTRUMENTS 3 70 ...
Page 154: ...5 TRANSPORT OPERATIONS 5 14 ...
Page 184: ...7 MAINTENANCE L213 and L215 machines with Electro Hydraulic EH controls 47946332B 6 7 20 ...
Page 250: ...7 MAINTENANCE 7 86 ...
Page 288: ...10 ACCESSORIES 10 2 ...