2-10
System Configuration and Setup
Stowing the expansion port cover
4.
Verify that the power cord is plugged into the NEC Versa Dock. (See
“Connecting the Power Cable” for details.)
5.
Ensure that the keylock switch is in the Normal position.
Motorized docking is only enabled when the keylock switch
is in the full upright position.
Summary of Contents for VERSA DOCK - SERVICE
Page 33: ...System Configuration and Setup 2 17 ...
Page 67: ...3 Disassembly and Reassembly n Required Tools and Equipment n Disassembly n Reassembly ...
Page 74: ...3 8 Disassembly and Reassembly Removing the bracket ...
Page 83: ...4 System Board Layout n Main Board n LED Board n PCI Expansion Board ...
Page 84: ...4 2 System Board Layout Main Board LED Board ...
Page 85: ...System Board Layout 4 3 PCI Expansion Board ...
Page 86: ...5 Illustrated Parts Breakdown n NEC Versa Dock Illustrated Parts Breakdown n Parts List ...
Page 87: ...5 2 Illustrated Parts Breakdown NEC Versa Dock Illustrated Parts Breakdown ...
Page 88: ...Illustrated Parts Breakdown 5 3 ...
Page 95: ...7 Troubleshooting n Quick Troubleshooting n Helpful Questions ...