
– 670 –
CHAPTER 5
Operation Procedure for System with PIR
5.5.4
Circuit Card Initialization Procedure
Circuit Card Initialization procedure for LINE/TRUNK circuit card is as follows.
(1) Turn the MB switch of circuit card to ON (upward).
(2) Turn back down the circuit card to OFF (downward) and confirm that MB lamp light green.
Note:
When initialization is executed, all calls using that circuit card will be disconnected and all channels will
be make-busy state.
Summary of Contents for SV8500
Page 303: ...256 CHAPTER 3 System Messages Related call release result b7 b0 b7 0 1 Released Not released 4...
Page 547: ...500 CHAPTER 3 System Messages IP Address of when failed to LOGIN b7 b6 b5 b4 b3 b2 b1 b0 16 19...
Page 597: ...550 CHAPTER 4 Fault Repair Procedures This page is for your notes...
Page 728: ...681 CHAPTER 6 Routine Maintenance Procedure Condition And Cause Procedure and Parts Used...
Page 748: ...701 CHAPTER 7 Maintenance Commands SYSTEM SELECT 3 SW 1 8 Not used STS OFF Fixed...
Page 973: ......
Page 974: ...Printed in Japan 0901 020...
Page 975: ......