CHAPTER 3 LAMP INDICATIONS AND SWITCH SETTINGS
PN-DAIA-A (DAI)
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 3.0
Page 313
NOTE 3: When the source clock signal is supplied via the line between the Main Site and the
Remote Site, set the SW1-1 and SW1-2 according to the following table. In this case,
DAIA cards (DAIA0, DAIA1) must be mounted in PIM 0.
CONDITIONS
DAIA0
DAIA1
· · · ·
DAIA5
REMARKS
SW
1-1
SW
1-2
SW
1-1
SW
1-2
SW
1-1
SW
1-2
SW
1-1
SW
1-2
One DAIA card is
provided.
ON
OFF
–
–
–
–
–
–
The clock signal is sent
to PLO0 of MP card via
Supply Route 0
(DAIA0).
Two or three DAIA
cards are pro-
vided.
ON
OFF
OFF
ON
OFF
OFF
OFF
OFF
The clock signal supply
route is automatically
changed to Route 1
(DAIA1) if a
transmission line failure
occurs on Supply Route
0.