CHAPTER 2 INSTALLATION
D
term
/DSS Console (DLC)
NEAX2000 IVS
2
Installation Procedure Manual
Page 162
ND-70928 (E), Issue 3.0
• Long Line (PN-2DLCB/PN-2DLCN)
Figure 2-66 MDF Cross Connection for D
term
/DSS Console (Long Line)
LEN000
LEN001
27
27
26
26
2
1
1
R0
29
T0
2
R1
28
T1
3
27
4
26
LTC0 (P)
26
T0
1
R0
27
T1
2
R1
28
3
29
4
LTC0 (J)
MDF
1
2
MODULAR CONNECTOR
PIM 0
P
PN-2DLCB/PN-2DLCN
LT00
LTC0
J
T1
T0
R0
R1
LEN000 (No. 0)
LEN001 (No. 1)
TO D
term
/
DSS CONSOLE
ROSETTE