CHAPTER 2 INSTALLATION
Wall Mounting Installation
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 3.0
Page 81
Wall Mounting Installation
• Check the site for installing the PBX with the work drawing to verify that
the required floor space is ensured and that service entrances and ducts
for trunk/extension cables, power cables and grounding conductors
have been properly worked at correct positions.
See
and
• Detach the front cover of each PIM. See
.
• Mark hole positions for installation of the PBX main equipment. See
.
• Secure the HANGER ASSEM to the wall.
• Hang the PIM to the HANGER ASSEM. See
NOTE: The BATTM cannot be installed on the wall.
• After hanging each PIM to the respective HANGER ASSEMs, connect
PIMs using screws. See
.
• Carefully review every step above to ensure that all necessary screws
are properly placed and tightened.
START
CHECKUP BEFORE
INSTALLATION
MARKING
INSTALLATION
MULTIPLE-PIM
CHECKING
DETACHING
FRONT COVER
END
CONFIGURATION
OF PIM