CHAPTER 2 INSTALLATION
Cable Running to MDF
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 3.0
Page 117
(3)
Connect the champ connector of each MDF cable to the LTC connector located on the PIM
using the screws provided, as shown below.
(4)
Secure the MDF cables to the PIM using tie wraps.
Figure 2-46 Cable Running to the External MDF (1 of 2)
(a) Using cable hole of BASE
BATTM
PIM 2
PIM 1
PIM 0
FRONT
CHAMP CONNECTOR
LTC CONNECTOR
PIM 3
TO MDF