CHAPTER 2 INSTALLATION
Installation of Main Equipment
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 3.0
Page 69
• Detaching FRONT COVER
(1) Push Portion A of the COVER PARTS to release the LATCH.
(2) Pivot the COVER PARTS on its left side to remove it.
(3) Loosen its one screw.
(4) Lift up the STOPPER to unlock.
(5) Pivot the FRONT COVER on its bottom to remove it.
Figure 2-12 Detaching FRONT COVER
(1)
PUSH COVER PARTS.
(2)
REMOVE COVER PARTS.
COVER PARTS
PUSH
PORTION A