
General Description 2-19
POWER Switch
Use the POWER switch to turn on/off the server.
Power On
Press the POWER switch on the front of the computer chassis.
The POWER/SLEEP lamp lights in green.
IMPORTANT:
If the power cord is connected to a power control device such as a
UPS (Uninterruptible Power Supply), make sure that the power
control device is powered.
If the power cord is connected to the server, an initial diagnosis of
the hardware starts. The POWER switch does not work while in
diagnosis. Wait for about 10 seconds, then press the POWER
switch.
Always allow POST to complete before powering down your
system (see the next subsection for POST).
POWER/SLEEP lamp
Summary of Contents for Express5800/120Eg
Page 16: ...x This page is intentionally left blank ...
Page 34: ...2 6 General Description Rear View 1 2 3 13 12 11 10 9 8 7 6 5 4 ...
Page 36: ...2 8 General Description Internal View 1 2 4 4 4 3 4 2 4 1 5 6 7 8 3 ...
Page 100: ...4 32 Configuring Your Server This page is intentionally left blank ...
Page 150: ...5 50 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 170: ...6 20 Installing and Using Utilities This page is intentionally left blank ...
Page 182: ...7 12 Maintenance This page is intentionally left blank ...
Page 257: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 266: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 268: ...A 2 Specifications This page is intentionally left blank ...
Page 278: ...C 4 IRQ and I O Port Address This page is intentionally left blank ...
Page 328: ...F 18 Installing Windows 2000 This page is intentionally left blank ...