
9-16 Upgrading Your Server
Installation
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
2.
Remove the side cover.
3.
Remove the two screws fixing the dummy cover.
4.
Pull out the dummy cover toward you carefully.
NOTE:
When installing a full-height device, remove two dummy
covers.
5.
Fix the rails coming with the server to the 5.25-inch device by using the four screws
coming with the device.
IMPORTANT:
Always use the screws coming with the 5.25-inch device. Using
longer screws or those of different diameter may cause the device to
be broken.
When installing a double-height device, use the DLT device rails
that come with the server.
Summary of Contents for Express5800/120Eg
Page 16: ...x This page is intentionally left blank ...
Page 34: ...2 6 General Description Rear View 1 2 3 13 12 11 10 9 8 7 6 5 4 ...
Page 36: ...2 8 General Description Internal View 1 2 4 4 4 3 4 2 4 1 5 6 7 8 3 ...
Page 100: ...4 32 Configuring Your Server This page is intentionally left blank ...
Page 150: ...5 50 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 170: ...6 20 Installing and Using Utilities This page is intentionally left blank ...
Page 182: ...7 12 Maintenance This page is intentionally left blank ...
Page 257: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 266: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 268: ...A 2 Specifications This page is intentionally left blank ...
Page 278: ...C 4 IRQ and I O Port Address This page is intentionally left blank ...
Page 328: ...F 18 Installing Windows 2000 This page is intentionally left blank ...