
1-10 Notes on Using Your Server
DISPOSAL AND CONSUMABLES
Dispose the server, all the internal devices, floppy disks, and CD-ROMs according to all
national laws and regulations.
IMPORTANT:
For disposal (or replacement) of the battery on the mother board of
the server, consult with your sales agent. In addition, dispose of the
provided power cord along with the server to prevent the diversion
to other devices.
It is the user's responsibility to completely erase or modify all the
data stored in storage device such as hard disk so that the data
cannot be restored.
Your server contains some components that are only good for a limited period of time and
require replacement, such as fans, internal batteries, the internal CD-ROM drive, the
floppy disk drive, and the mouse. For stable operation of the server, NEC recommends
you replace these components on a regular basis. Consult with your sales agent for
replacement or the product lives.
WARNING
Do not remove the lithium battery.
Your contains the lithium battery. Do not remove the battery. Placing the
lithium or nickel cadmium battery close to a fire or in the water may cause an
explosion.
When the server does not operate appropriately due to the dead lithium battery,
contact your sales agent. Do not disassemble the server to replace or recharge
the battery by yourself.
Mother board
Summary of Contents for Express5800/120Eg
Page 16: ...x This page is intentionally left blank ...
Page 34: ...2 6 General Description Rear View 1 2 3 13 12 11 10 9 8 7 6 5 4 ...
Page 36: ...2 8 General Description Internal View 1 2 4 4 4 3 4 2 4 1 5 6 7 8 3 ...
Page 100: ...4 32 Configuring Your Server This page is intentionally left blank ...
Page 150: ...5 50 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 170: ...6 20 Installing and Using Utilities This page is intentionally left blank ...
Page 182: ...7 12 Maintenance This page is intentionally left blank ...
Page 257: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 266: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Page 268: ...A 2 Specifications This page is intentionally left blank ...
Page 278: ...C 4 IRQ and I O Port Address This page is intentionally left blank ...
Page 328: ...F 18 Installing Windows 2000 This page is intentionally left blank ...