![background image](http://html.mh-extra.com/html/nec/express5800-110ei/express5800-110ei_user-manual_251177059.webp)
Setting Up Your Server 3-9
To connect the power cord from the server to an interruptive power supply (UPS), use service
outlets on the rear of the UPS.
The UPS service outlets are categorized into two groups: SWITCH OUT and UN-SWITCH OUT.
(They may be called "OUTPUT1" and "OUTPUT2".)
To control power supply with an application (NEC ESMPRO UPSController) that controls the UPS,
connect the power cord to an SWITCH OUT outlet.
For constant power supply, connect the power cord to a UN-SWITCH OUT outlet. (Connect the
modem that is in service for 24 hours to this outlet.)
<Example>
When the power cord from the server to a UPS, change the BIOS setup utility of the server to link
with power supply from the UPS.
Change a parameter for "AC-LINK" of the Advanced menu of the BIOS setup utility. See Chapter
4 for details.
UN-SWITCH OUT
(OUTPUT 2)
SWITCH OUT
(OUTPUT 1)
Summary of Contents for Express5800/110Ei
Page 16: ...x This page is intentionally left blank ...
Page 33: ...General Description 2 5 Rear View 1 2 3 2 4 5 6 7 8 9 10 11 12 ...
Page 104: ...4 42 Configuring Your Server This page is intentionally left blank ...
Page 148: ...5 44 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 168: ...6 20 Installing and Using Utilities This page is intentionally left blank ...
Page 180: ...7 12 Maintenance This page is intentionally left blank ...
Page 270: ...10 14 Internal Cabling Diagrams This page is intentionally left blank ...
Page 272: ...A 2 Specifications This page is intentionally left blank ...
Page 314: ...F 4 Product Configuration Record Table This page is intentionally left blank ...