User’s Guide DrafStation and Drafstation Pro
Chapter 3: Basics
58
AP-75730, Rev. 2.1, 19/01/2009
Step 3 :
Install a new waste fluid tank (1) in the plotter as shown on the image below.
N° Name
1
Waste fluid tank
Step 4 :
Verify that the operation panel displays "Exchange Tank? No".
Step 5 :
Select “Yes", and press the [Enter] key on the operation panel.
Notes
•
In case of pulling out the waste fluid tank accidentally, press the [Enter] key on the operation panel
when "Exchange Tank? No" is being displayed.