KIROVETS K-744R1, K-744R2, K-744R3, K-744R4 tractors
78
Fig. 23 Adjustment of lower links
1
– rear hinge pivots; 2, 3 – lower track rods;
4
– outer stop; 5 – internal stop; 6 – stop;
7
– washer; 8 – bolt
– fix the lower links 2 and 3 with each other, providing the size of 1,165±1.5 mm between
lifting eyes of rear hinge pivots 1.
– lift the mounted implement providing the distance of 1,180...1,280 mm from the
supporting surface to the lower links; in doing so, the links 2 and 3 shall be located
between the outer stop 4 and the internal stop 5 (Fig. 23). Stops 744
Р3-46 28021-1,
pos.6, shall be installed on the side of outer stops.
– by means of moving washers 7 from under the head of bolt 8 under stop 6, if
necessary, provide the value of lateral movement of lower links to be no more than 5 mm.
5.1.2 Installation of light signaling equipment
ATTENTION!
During final assembly of the tractor with regard to light signaling
equipment, it is necessary to thoroughly see for the fact that electrical harnesses and
wires should not touch sharp edges, moving parts of the tractor as well as should not
be clamped against sharp edges during erection operations.
Perform installation of light signaling equipment with the battery master switch being switched
off. The front and rear work lights should be mounted on the installation brackets in the upper
part of the cabin on the front and on the rear respectively.
Front working
headlamps
harness of working lamps
and “road-train”
working headlamp
bracket