KIROVETS K-744R1, K-744R2, K-744R3, K-744R4 tractors
116
Job content
Preparation for
operating
running-in
Execution of
operating
running-in
Completion of
operating
running-in
Note
Check the electrolyte
density and, if necessary,
bring it to the required value
depending upon the climatic
area, in which the tractor is
operated
Check the condition of
filtration elements of the 1st
and 2nd stages of air
cleaner and, if necessary,
perform their maintenance
Check threaded
connections and other
connections of the engine
and the entire tractor and
tighten, if necessary
Pay special
attention to
tightening the
nuts of fasteners,
wheels, driving
axle brackets,
wedge
connections of
the axles of
vertical pivot of
frame, bolts for
fastening clamps
for intermediate
bearing
Check how does the engine
work by ear and by
monitoring instruments
Perform
operation during
the tractor being
in service
Check the operation of
tractor control mechanisms,
operation of brakes, window
wipers, lighting and
signaling, hydraulic systems
of mounted implements and
steering control
Set the switch of seasonal
adjustment of the voltage
regulator into the position
corresponding to the season
Upon shutdown of the
engine, immediately check
the operation of
turbocompressor and
engine centrifugal oil filter
by ear
Additional maintenance operations after running-in
Job content
Note
Perform maintenance of nozzles:
– for 8481.10 engine
Execute the operation at the first maintenance from
the beginning of operation (M-1) (125 engine
hours)
Check the fasteners and tighten, if necessary:
– tractor wheels
Execute
the
operations
at
the
first
two
maintenance sessions from the beginning of
operation (M-1) (125, 250 engine hours)
– drive axle clamp nuts;
Execute
the
operations
at
the
first
two
maintenance sessions from the beginning of
operation (M-1) (125, 250 engine hours)