MTS Exceed™ 22 Series Product Information
32
Installing Shields
Installation
Installation of electric control box: Align screw holes of the electric control box
with locknut of the shield and fix them with screws. After the electric control box
is level, fasten the screws. Ground wire should be connected between the electric
control box and the main unit. As the electric control box is already equipped
with ground wire, you only need to connect the wire to the main frame after the
electric control box is fixed.
Main shield
Locknut
Electric control box
Summary of Contents for Exceed 22 Series
Page 54: ...MTS Exceed 22 Series Product Information 54 Shortcut Operations Operation...
Page 58: ...MTS Exceed 22 Series Product Information 58 Troubleshooting...
Page 60: ...MTS Exceed 22 Series Product Information 60 Equipment Disassembly...
Page 67: ......
Page 68: ...m MTS Systems Corporation http www mts com en Global index asp ISO 9001 Certified QMS...