![MRV Communications OptiSwitch-2400/L3 User Manual Download Page 19](http://html1.mh-extra.com/html/mrv-communications/optiswitch-2400-l3/optiswitch-2400-l3_user-manual_1846068019.webp)
OptiSwitch 2400/L3
Getting
Started
C
HAPTER
2
11
Name Color
/
Type of
Light
Function
ACTIVE
(MNGT PORT 1)
Green
On:
Indicates activity of the
Ethernet link
Off:
Indicates no activity of Ethernet
the link
SLAVE Green
Future Use
MASTER Green
Future Use
The following table displays the Routing Controller’s various
connectors and their functions:
Name Color
/
Type of
Light
Function
MGMT PORTS
-
Two Ethernet connectors for
management purposes
RS-232
(Connector)
-
Connected:
Direct CLI connection
Optiswitch-2400/L3 Installation
Safety Requirements
Rack Mounting
If rack mounted units are installed in a closed or multi-unit rack assembly,
they may require further evaluation by Certification Agencies. The following
items must be considered.
1. The ambient within the rack may be greater than room
ambient. Installation should be such that the amount of air
flow required for safe operation is not compromised. The
maximum temperature for the equipment in this
environment is 50
°
C. Consideration should be given to the
maximum rated ambient.