Surveyor Central
4-10
Conformance Testing
Conformance testing is to be performed by Authorized Mortara Service Representatives to verify the
device is functioning correctly after repair operations have been performed. Testing results should be
documented on the test data record at the end of this section of the manual.
Due to the complexity of the Surveyor Central System, not all sections of the conformance testing
procedure may be required to verify conformance of a particular repair activity. Based upon the repair
performed, the repair technicia
n may deem various sections as “non-applicable” since they were not
related to the functions associated with the repair; in such cases the decision to exclude a section shall
be documented on the test data record provided.
System/Network
Node to node connectivity check:
From a Surveyor Central control node, communicate to the other nodes of the networked system by opening a
command prompt and pinging each node’s IP Address per the system network diagram.
Export and Archive Function:
Equipment needed:
X12+/T12(S) transmitter, patient cable, patient simulator.
Start a monitoring session on the Surveyor Central using the test transmitter and patient simulator.
Once the system has had enough time to perform and display measurements on the system display,
select 12-Lead+Exp from the Print Option menu.
Verify the system has exported a digital copy of the ECG to either E-Scribe or the defined export location.
Verify a hard copy was sent to the defined printer.
Stop the monitoring session and select the option indicating that the monitoring session just stopped and
archive the study from the “Patients” tab.
Verify the archived data is present in the specified archive path.
Time Synchronization:
Shutdown all nodes of the Surveyor Central system, except the storage server.
On the storage server, expand the “Gaurdian” application.
Right click anywhere in the guardian application screen and select
“reboot”.
Once the server is booting up, verify that during the bootstrap process it states “Time Synchronized”.