www.miinet.com
Moore Industries-International, Inc.
- 23 -
User’s Manual
224-790-00K
May 2018
Programmable Limit Alarm Trips
SPA
2
SECTION 3
CE Certification-related Guidelines
Installation of any Moore Industries’ products that carry the CE marking must adhere to the
guidelines in the Recommended Ground Wiring Practices section in order to meet the EN 61326
requirements set forth in the applicable EMC directive.
The Low Voltage Directive also applies to the AC powered units and/or when connecting any of
its output relay contacts to voltages greater than 50 vac. In order to comply with EN61010-1 (Low
Voltage Directive) all guidelines in this section must be followed.
Contact/Load Suppression
When the instrument relays are used to switch an inductive load such as an external relay coil,
contactor, solenoid, large voltage spikes may be created in nearby cable harnesses. When
excessive, these voltage spikes can disrupt the operation of all nearby electronics including this
product. Inductive loads should have suppression devices installed at the load (for external relays
this would be right across the relay coil itself). Usually this is a simple diode for dc circuits. AC
circuits routinely use an R-C snubber. Please follow the external load manufacturer instructions for
their recommended suppression kits
.
Installation in Hazardous Locations
This section contains important information regarding installation of SPA
2
in Hazardous Area
Locations.
WARNING:
Explosion Hazard. Do not disconnect equipment when a flammable or combustible atmosphere is
present.
AVERTISSEMENT:
Risque d’explosion. Ne pas débrancher tant que le circuit est sous tension, a moins qu’il ne
s’ agisse d’un emplacement non dangereux.
WARNING:
Explosion Hazard. Substitution of components may impair suitability for Class I, Division 2.
AVERTISSEMENT:
Risque d’explosion. La substitution de composants peut rende ce materiel inacceptable pour les
emplacements de Classe I, Division 2
.
Specific Conditions of Use
The following instructions must be adhered to when the SPA
2
is used in hazardous locations and
potentially explosive atmospheres.
cFMus Installations
Non-Incendive Applications
Class 1 Division 2 Groups A-D
The SPA
2
shall be installed in compliance with the enclosure, mounting and spacing and segregation
requirements of the ultimate application.
Non Hazardous or Ordinary Locations
The equipment is suitable for use in ordinary or non-hazardous locations.