5.7.6 Flange Nozzle Assembly
1. Apply anti-seize compound to the ball plunger threads.
2.
Install the ball plunger into the flange with a 2.5 mm (0.10 in.) hex wrench.
Make sure the ball plunger top surface is lower than the flange top
surface by at least 0.08 mm (0.003 in.).
0.08 mm
3. Apply anti-seize compound to the nozzle threads and then thread the
nozzle into the flange. Torque nozzles to specified value. Remember to
re-torque at process temperature when system assembly is complete.
5-17
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
ASSEMBLY
FSG2 User Manual
Summary of Contents for Fusion G2
Page 1: ...version 14 User Manual Original Instructions...
Page 2: ......
Page 10: ......
Page 64: ......
Page 151: ......