Section 8 - System
Installation
WARNING
Ensure that you have fully read “Section 3 - Safety” before installing your
FUSION SERIES
®
G2 system.
Make sure the lifting eyebolt, lifting chain and crane are rated to adequately
support the system. Failure to do so can cause a serious injury.
CAUTION
Do not assemble or disassemble the cavity plate with the valve pins
forward.
Potential pinch point for wires. Ensure that all wires are in the retainer
grooves.
CAUTION
The following section is a general guide to installing your FUSION SERIES
®
G2 Hot Runner into an existing manifold plate system or spacer block system.
It is important to refer to the General Assembly drawings for full instructions.
8.1 Unpacking
1. Carefully open the shipping crate and inspect the contents. Secure loose
items and check for any damage. Remove any documentation or spares
packages and set aside.
2. After removing all restraints, attach the sling to the hoist and carefully
remove the manifold assembly from the shipping crate.
3. Verify all dimensions and tolerances and prepare the manifold for
insertion into the mold cavity.
4. Prepare the mold cavity for the FUSION SERIES
®
G2 manifold insertion.
5. Clean all surfaces and dowel holes, ensuring that no debris, burrs,
shavings, dust, dirt, or other foreign material which could interfere with fit.
Ream mold (cold half) holes if necessary.
8-1
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
SYSTEM INSTALLATION
FSG2 User Manual
Summary of Contents for Fusion G2
Page 1: ...version 14 User Manual Original Instructions...
Page 2: ......
Page 10: ......
Page 64: ......
Page 151: ......