5.8.2 Assemble Gate Seals to Nozzle
5. Apply anti-seize compound to all threaded interfaces.
6. Ensure all sealing surfaces are clean and dry.
7. Install the gate seal and liner.
8.
Torque to specified values. Remember to re-torque at process
temperature when system assembly is complete.
5-20
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
ASSEMBLY
FSG2 User Manual
Summary of Contents for Fusion G2
Page 1: ...version 14 User Manual Original Instructions...
Page 2: ......
Page 10: ......
Page 64: ......
Page 151: ......