![Mitsubishi Electric Got 1000 User Manual Download Page 46](http://html.mh-extra.com/html/mitsubishi-electric/got-1000/got-1000_user-manual_240964046.webp)
5 - 4
5. UL, cUL STANDARDS AND EMC DIRECTIVE
5.2 EMC Directive
5.2.2
EMC Directive-Compliant System Configuration
For information of the EMC Directive-compliant models please consult with your nearest Mitsubishi product provider.
GOT
Use any of the following GOTs with which CE mark logo is printed on the rating plate.
When using a GOT other than shown below, the system does not conform to the EMC Directive.
POINT
POINT
POINT
Checking method of hard ware version.
Confirm the hardware version with the rating plate of the GOT.
Connection method
Use the following methods to connect with the GOT to ensure compliance with the EMC Directive.
: Compliant with EMC Directive
: Not compliant with EMC Directive
*1
When connecting the GOT to other controllers as a PLC manufactured by other company, create the cable (by the user) and
configure the system to meet the EMC Directive specifications for the connected device.
POINT
POINT
POINT
Connected devices
If connecting to the PLC or microcomputer other than Mitsubishi products
(MELSEC-Q series, MELSEC-L series, MELSEC-QnA , MELSEC-A series or MELSEC-FX series) please
refer to the EMC Directive compliance manual for that specific device.
Item
Model
Hardware version of the GOT
GT1455-Q
GT1455-QTBD
GT1455-QTBDE
Version C or later
GT1450-QMBD
GT1450-QMBDE
-
GT1450-Q
GT1450-QLBD
GT1450-QLBDE
Version C or later
Hardware
version
AA
Connection method
*1
GT14
Direct connection to CPU
Computer link connection
CC-Link connection (via G4)
Ethernet connection
GOT multi-drop connection
Other connections
*1
Summary of Contents for Got 1000
Page 1: ......
Page 2: ......
Page 14: ...A 12 ...
Page 26: ...1 4 1 OVERVIEW 1 1 Features ...
Page 34: ...2 8 2 SYSTEM CONFIGURATION 2 2 System Equipment ...
Page 38: ...3 4 3 SPECIFICATIONS 3 3 Power Supply Specifications ...
Page 42: ...4 4 4 PARTS NAME 4 3 Rear Face ...
Page 54: ...6 6 6 INSTALLATION 6 5 Installation Procedure ...
Page 104: ...10 18 10 COMMUNICATION INTERFACE SETTING COMMUNICATION SETTING 10 3 Ethernet Setting ...
Page 226: ...13 92 13 FILE DISPLAY AND COPY PROGRAM DATA CONTROL 13 2 Various Data Control ...
Page 250: ...15 2 15 CLEANING DISPLAY SECTION CLEAN ...
Page 264: ...16 14 16 INSTALLATION OF COREOS BOOTOS AND STANDARD MONITOR OS 16 5 CoreOS ...
Page 272: ...17 8 17 MAINTENANCE AND INSPECTION 17 5 Backlight Shutoff Detection ...
Page 298: ...App 6 APPENDICES Appendix 1 External Dimensions ...
Page 302: ...App 10 APPENDICES Appendix 3 Transportation Precautions ...
Page 306: ...REVISIONS 2 ...
Page 309: ......
Page 310: ......