![Mitsubishi Electric Got 1000 User Manual Download Page 270](http://html.mh-extra.com/html/mitsubishi-electric/got-1000/got-1000_user-manual_240964270.webp)
17 - 6
17. MAINTENANCE AND INSPECTION
17.4 Battery Voltage Low Detection and Battery Replacement
Handling of Batteries and Devices with Built-in Batteries in EU Member States
This section describes the precautions for disposing of waste batteries in EU member states and exporting batteries
and/or devices with built-in batteries to EU member states.
(1) Disposal precautions
In EU member states, there is a separate collection system for waste batteries. Dispose of batteries properly at
the local community waste collection/recycling center.
The following symbol is printed on the batteries and packaging of batteries and devices with built-in batteries
used for Mitsubishi Graphic Operation Terminal (GOT).
Symbol
POINT
POINT
POINT
This symbol is for EU member states only.
The symbol is specified in the new EU Battery Directive (2006/66/EC) Article 20 "Information for end-users" and
Annex II.
The symbol indicates that batteries need to be disposed of separately from other wastes.
(2) Exportation precautions
The new EU Battery Directive (2006/66/EC) requires the following when marketing or exporting batteries and/or
devices with built-in batteries to EU member states.
• To print the symbol on batteries, devices, or their packaging
• To explain the symbol in the manuals of the products
(a) Labeling
To market or export batteries and/or devices with built-in batteries, which have no symbol, to EU member
states on September 26, 2008 or later, print the symbol shown in (1) on the GOT or their packaging.
(b) Explaining the symbol in the manuals
To export devices incorporating Mitsubishi Graphic Operation Terminal to EU member states on September
26, 2008 or later, provide the latest manuals that include the explanation of the symbol.
If no Mitsubishi manuals or any old manuals without the explanation of the symbol are provided, separately
attach an explanatory note regarding the symbol to each manual of the devices.
POINT
POINT
POINT
The requirements apply to batteries and/or devices with built-in batteries manufactured before the enforcement
date of the new EU Battery Directive (2006/66/EC).
Summary of Contents for Got 1000
Page 1: ......
Page 2: ......
Page 14: ...A 12 ...
Page 26: ...1 4 1 OVERVIEW 1 1 Features ...
Page 34: ...2 8 2 SYSTEM CONFIGURATION 2 2 System Equipment ...
Page 38: ...3 4 3 SPECIFICATIONS 3 3 Power Supply Specifications ...
Page 42: ...4 4 4 PARTS NAME 4 3 Rear Face ...
Page 54: ...6 6 6 INSTALLATION 6 5 Installation Procedure ...
Page 104: ...10 18 10 COMMUNICATION INTERFACE SETTING COMMUNICATION SETTING 10 3 Ethernet Setting ...
Page 226: ...13 92 13 FILE DISPLAY AND COPY PROGRAM DATA CONTROL 13 2 Various Data Control ...
Page 250: ...15 2 15 CLEANING DISPLAY SECTION CLEAN ...
Page 264: ...16 14 16 INSTALLATION OF COREOS BOOTOS AND STANDARD MONITOR OS 16 5 CoreOS ...
Page 272: ...17 8 17 MAINTENANCE AND INSPECTION 17 5 Backlight Shutoff Detection ...
Page 298: ...App 6 APPENDICES Appendix 1 External Dimensions ...
Page 302: ...App 10 APPENDICES Appendix 3 Transportation Precautions ...
Page 306: ...REVISIONS 2 ...
Page 309: ......
Page 310: ......