-
136
-
'11 • PAC-T-160
2) Model FDC100VS, 125VS, 140VS
a) Replace the PCB
after elapsing 3 minutes from power OFF
.
(
Be sure to measure voltage (DC)
on both capacitor terminals located in controller back, and
check that the
voltage is discharged sufficiently
.(Refer to Fig.1))
b) Take off the connection of inverter PCB terminal block connector and remove the screw of power transistor then
remove the PCB. Wipe off the silicon grease neatly on the controller’s radiation heat fins.
c) Refer to table1 for the setting of switch (JSW10,11) of new PCB.
d) Before installing the power transistor on the new PCB, Apply uniformly a bundled of silicon grease first on the
surface of power transistor.Make sure it is applied to prevent damage on power transistor.
e) Tighten the screw of power transistor on inverter PCB and connect the terminal block.Confirm the connection and
don’t use soldering in the connection.Tighten properly the power transistor with a screw and make sure there is no
clearance gap.Power transistor can be damage if not properly tighten.(Recommended power transistor tightening
torque:0.98~1.47N∙m)
Parts No.
Parts arrangement view
Fig.1 Position of capacitor
TB5
TB6
CNI2
Connector
CNR
TB7
TB8
TB9
Voltage measurement parts
Switch
JSW11
JSW10
CNW2
Terminal
block
CNO1
CNW1
-1
OFF
-1
OFF
-2
OFF
-2
ON
-3
OFF
-3
OFF
JSW10
-4
OFF
JSW11
-4
ON
Table. 1 Switch setting
PCA012D025C
D
Summary of Contents for FDF100VNVD
Page 81: ... 80 80 11 PAC T 160 ...
Page 82: ... 81 81 11 PAC T 160 ...
Page 83: ... 82 82 11 PAC T 160 ...