- 33 -
7.4
Step - 2 Test run of air conditioning system
Perform test run only on air conditioning system.
(1) Checking items before test run
Check that test run of air conditioning units is completed.
(2) Turning on the power of all the air conditioning units and system controllers
Turn on the power of all the air conditioning units and system controllers (ex. System remote controller).
(3) Restarting the BAC-HD150
Restarting the BAC-HD150, then it becomes [Online mode].
The setting data made in Step - 1 such as air conditioning system group is automatically sent from BAC-HD150 to air
conditioning system.
(It may take about 5 minutes for the setting.)
(4) Test run using system controller or remote controller
Perform test run using system controller or remote controller to check operation status of each unit.
* Refer to the Installation Manual that came with air conditioning unit and system controller for how to perform test run.
HUB
HUB
BACnet
®
M-NET
M-NET
M-NET
Step-2
Outdoor unit
Outdoor unit
Indoor unit
Indoor unit
ME remote controller
ME remote controller
LOSSNAY
LOSSNAY
BMS
System controller
㩷
HUB
LAN2
BAC-HD150
Setting Tool
WT05542X04.book Page 33 Wednesday, July 3, 2013 12:13 PM