Installation
185
In
st
allatio
n
Adding a Peripheral Cabinet
1. Install the peripheral cabinet (including Bay Power Supply, Bay
Control Card, and required Fiber or Copper Interface Module).
2. Connect the fiber or copper cable to the interface module in the
control cabinet.
3. Power up the cabinet.
4. Enter CDE mode on the maintenance terminal.
5. Select Form 01, System Configuration and configure the new cards
(select node type as required).
6. Complete remaining CDE for the new cards.
Refer to
Powering Up the Nodes (page 59).
Make sure there are enough devices available
(CDE Form 04, Option 103).
Summary of Contents for SX-200 EL
Page 1: ...TECHNICIAN S HANDBOOK LIGHTWARE 19 RELEASE 3 0 ...
Page 11: ...Chapter 1 Introduction ...
Page 12: ......
Page 32: ...Technician s Handbook 22 ...
Page 33: ...Chapter 2 Routine Maintenance ...
Page 34: ......
Page 55: ...Chapter 3 Troubleshooting and Repair ...
Page 56: ...Technician s Handbook 46 ...
Page 88: ...Technician s Handbook 78 Figure 16 E M Trunk Type I 2 wire ...
Page 110: ...Technician s Handbook 100 ...
Page 111: ...Chapter 4 Programming ...
Page 112: ......
Page 168: ...Technician s Handbook 158 ...
Page 169: ...Chapter 5 Installation ...
Page 170: ......
Page 239: ...Chapter 6 Maintenance Commands ...
Page 240: ......
Page 258: ...Technician s Handbook 248 ...
Page 261: ...Notes ...
Page 262: ...Technician s Handbook Notes ...