Installation
179
In
st
allatio
n
Initial Power-up Procedure
(SX-200 EL/ML)
When the system is first installed, use the following procedure to enter
the database into the system using CDE.
1. Verify that the options identified on the MOSS have been
purchased.
2. Ensure that the System ID module is installed.
3. Insert the flash memory card into the slot on the Main Control Card
(make sure the toggle switch on the edge opposite the connector
edge of the flash memory card has the Write Protect disabled).
4. Turn the power supply ON, and wait for the power-up sequence to
complete.
5. Press RETURN four times; the terminal display returns:
1 - VT100™ COMPATIBLE
2 - TTY TYPE
3 - IBM PC
SELECT A TERMINAL TYPE :
6. Select the terminal type by entering “1”. The display returns:
1 - MAINTENANCE
2 - CDE
6 - QUIT
SELECT AN APPLICATION ( OR QUIT TO START OVER ) :
If powering up a single cabinet system, immediately revise
Alarm Thresholds to eliminate PCM alarms (software defaults
to a multi-cabinet system).
Users must purchase the option and its associated password
through their usual ordering channels prior to attempting to
install or implement the option.
Refer to the
SX-200 EL/MLTechnical Documentation, Installation
Procedures
.
Summary of Contents for SX-200 EL
Page 1: ...TECHNICIAN S HANDBOOK LIGHTWARE 19 RELEASE 3 0 ...
Page 11: ...Chapter 1 Introduction ...
Page 12: ......
Page 32: ...Technician s Handbook 22 ...
Page 33: ...Chapter 2 Routine Maintenance ...
Page 34: ......
Page 55: ...Chapter 3 Troubleshooting and Repair ...
Page 56: ...Technician s Handbook 46 ...
Page 88: ...Technician s Handbook 78 Figure 16 E M Trunk Type I 2 wire ...
Page 110: ...Technician s Handbook 100 ...
Page 111: ...Chapter 4 Programming ...
Page 112: ......
Page 168: ...Technician s Handbook 158 ...
Page 169: ...Chapter 5 Installation ...
Page 170: ......
Page 239: ...Chapter 6 Maintenance Commands ...
Page 240: ......
Page 258: ...Technician s Handbook 248 ...
Page 261: ...Notes ...
Page 262: ...Technician s Handbook Notes ...