11
3.
Setting-up procedures
1. Get the tester from the box and make the external inspection.
2. Keep the tester in normal environmental conditions for at least 2 hours
(if the tester has been previously kept in conditions distinct from nor-
mal).
3. Plug-in the power supply unit to the electric network (if you use mains
voltage 110–240 V with the 50–60 Hz frequency).
4. Switch on the tester.
Bercut-ET. Operations manual