22
Analysis. Typical tasks and solutions
.
.
.
.
1
2
X %
2
Figure 5.3. Frame Loss Rate
4.
Back-to-back. The test allows estimating the time during which the DUT
is capable to manage the maximum load.
The analyzer sends a burst of frames with minimum interframe gap to
the DUT and then counts the number of frames forwarded by the DUT.
If the count of transmitted frames is equal to the number of frames
forwarded, the time of transmission is being increased and the test is
being rerun until there are two trials succeeded with no frame lost. If
the number of forwarded frames is less than the number of transmitted
ones, the time of transmission is being reduced and the test is being
rerun.
.
.
.
.
Figure 5.4. Back-to-Back
Bercut-ET. Operations manual
Summary of Contents for Bercut-ET
Page 6: ...6 Bercut ET Operations manual ...
Page 8: ...8 Bercut ET Operations manual ...
Page 10: ...10 Bercut ET Operations manual ...
Page 12: ...12 Bercut ET Operations manual ...
Page 18: ...18 Bercut ET Operations manual ...
Page 65: ...5 12 Testing TCP IP 65 Figure 5 68 Response example Bercut ET Operations manual ...
Page 96: ...96 Bercut ET Operations manual ...
Page 102: ...102 Bercut ET Operations manual ...
Page 114: ...114 Bercut ET Operations manual ...