56
Analysis. Typical tasks and solutions
Figure 5.55. Connection diagram 2
2. Switch to the
Ping
menu (see fig. 5.56). Press
button (
Setup
).
Figure 5.56. Ping menu
Functional buttons:
•
(
Start
) — test start;
•
(
Statistics
) — switch to the
Ping statistic
screen;
•
(
Setup
) — switch to the
Ping settings
menu.
3. Set test parameters in the
Ping settings
menu.
Bercut-ET. Operations manual
Summary of Contents for Bercut-ET
Page 6: ...6 Bercut ET Operations manual ...
Page 8: ...8 Bercut ET Operations manual ...
Page 10: ...10 Bercut ET Operations manual ...
Page 12: ...12 Bercut ET Operations manual ...
Page 18: ...18 Bercut ET Operations manual ...
Page 65: ...5 12 Testing TCP IP 65 Figure 5 68 Response example Bercut ET Operations manual ...
Page 96: ...96 Bercut ET Operations manual ...
Page 102: ...102 Bercut ET Operations manual ...
Page 114: ...114 Bercut ET Operations manual ...