![Matec CHDF 2000 Hardware Manual Download Page 43](http://html.mh-extra.com/html/matec/chdf-2000/chdf-2000_hardware-manual_1739955043.webp)
4-3
Matec Applied Sciences
56 Hudson St., Northborough, MA 01532 Ph: (508) 393-0155 Fax: (508) 393-5476
www.matec.com
e-mail: [email protected]
Figure 4.2 The Prepare System...Prime Pump Screen
Note:
The order of the instructions on the screen shown above is incorrect. The correct
sequence of steps is: 1, 2, 3, 6, 5, 4. These are described in detail below.
3.
Attach syringe (screen step 1) – Attach the syringe to the priming valve.
Figure 4.3 Inserting Syringe in Pump Priming Valve
4.
Open valve (screen step 2) – With the syringe attached to the priming valve, open the
valve by turning the top of the valve to the left (see Figure 4.3).
5.
Draw eluant (screen step 3) – Carefully draw eluant into the syringe until:
•
Air bubbles disappear from the eluant inlet tubing to the pump.
•
The syringe draws steady fluid from the valve.
To open
pH Sensor
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com