Suggested Maintenance Schedule
The YB8 sampler requires only minimal maintenance to ensure proper and reliable operation. The
following is a listed of suggested maintenance items and estimated times for accomplishing those tasks. Your
actual times and needs may differ.
Plan
Item
Frequency
Time
Description of Maintenance
Maintenance
Lubrication
Only as needed
10
The peristaltic pump requires no regular lubrication.
min
Inspection
Pump Tubing Every Week
1 min
See Below.
Maintenance
Inspection
Pump Case
Every Month
3 min
Manning recommends occasional cleaning to remove
Maintenance
particulates that if caught between the wall and the tube, can
cause increased wear of the pump tubing. Do not apply any oil
or other lubricating substances to the pump body as this will
inhibit the ability of the pump to operate correctly and will
significantly impact the life of the pump tubing.
Inspection
Pump Rollers Every Month
2 min
Manning recommends occasional cleaning to ensure smooth
Maintenance
rolling and less wear of pump tubing.
Inspection
Clear Pump
Every Month
3 min
Check to ensure that the clear lid is clean of residual materials
Maintenance
Lid
and contaminants so that the operation of the pump can be
clearly seen.
Inspection
Strainer
Every Week
10min
Ensure that the strainer is not collecting materials that would
Maintenance
inhibit fluid from reaching the pump. If material is collecting,
clean the strainer and reposition at the appropriate spot in the
flow stream.
Inspection
Intake tubing
Every Week
4 min
Ensure that the connectors are fitting tightly together. This
Maintenance
connectors
ensures the sampler is not experiencing vacuum leaks which
can degrade the samplers performance.
Inspection
Liquid
Every Week
2 min
Inspect the liquid sensor.
Maintenance
Sensor
Continuity Type - Make sure that good connection is being
made on the continuity sensor. Check to make sure that no
foreign matter is making a connection between the leads.
Cleaning of the inside of the sensor is recommended to ensure
good continuity is maintained for the detection of liquid.
Ultrasonic - Make sure that good contact is being made
between the tubing and the ultrasonic sensors.
The tubing
should be seated firmly in the sensor block with the
tubing in solid contact with the walls of the sensor.
Inspection
Intake tubing
Every Month
10
Check the intake tubing to ensure that it is clean. Cleaning
Maintenance
min
can be accomplished by running a cleaning solution through
the tubing by using the test cycle feature of the unit.
Summary of Contents for YB8
Page 2: ......
Page 4: ......
Page 22: ...INSTALLATION AND OPERATION MODEL YB8 April 1999 Manning Environmental Inc Page A 12...
Page 30: ......
Page 61: ...MODEL YB8 PROGRAMMING SECTION April 1999 Manning Environmental Inc THIS PAGE BLANK...
Page 90: ......
Page 106: ......
Page 108: ......
Page 119: ...9 YB8 Sampler Theory of Operation Figure 8 YB8 Sampler Block Diagram...