![Manning YB8 Operating And Instruction Manual Download Page 20](http://html1.mh-extra.com/html/manning/yb8/yb8_operating-and-instruction-manual_701729020.webp)
INSTALLATION AND OPERATION
MODEL YB8
April 1999/Manning Environmental Inc.
Page A-10
Figure 13
- Bottle
Full
Sensor
Figure 14
- Gear Arrangement
Figure 15
- Distribution System
Distribution Assembly Installation
Single Bottle Sampling
1.
Center the sample bottle in the refrigerator.
2.
Run the discharge hose through the Bottle Full sensor ring and then place it at the
desired height in the bottle. To adjust the position simply slide the bottle full
sensor either up or down the discharge hose.
3.
Connect the
Bottle Full sensor probes to the female contacts on the bottle full
c
able comming from the electronics enclosure into the refrigerator.
Multiple Bottle Sampling
Suspension Plate Installation
Position the suspension plate so the handles are on the sides. Slide the plate onto the top
rails in the refrigerator. The plate should be flush with the front of the refrigerator so it
does not interfere with the drain trough in the rear.
Distributor Assembly
1.
Verify that the
spout is correctly aligned on the distribution bracket. The spout should be centered
on the bracket side when the spout is rotated to the side (3 o'clock position).
Summary of Contents for YB8
Page 2: ......
Page 4: ......
Page 22: ...INSTALLATION AND OPERATION MODEL YB8 April 1999 Manning Environmental Inc Page A 12...
Page 30: ......
Page 61: ...MODEL YB8 PROGRAMMING SECTION April 1999 Manning Environmental Inc THIS PAGE BLANK...
Page 90: ......
Page 106: ......
Page 108: ......
Page 119: ...9 YB8 Sampler Theory of Operation Figure 8 YB8 Sampler Block Diagram...