![Manning YB8 Operating And Instruction Manual Download Page 48](http://html1.mh-extra.com/html/manning/yb8/yb8_operating-and-instruction-manual_701729048.webp)
PROGRAMMING SECTION
MODEL YB8
April 1999/Manning Environmental Inc.
3DJH%
This menu allows the user to exit back to the SAMPLER READY prompt from which other programs or
functions can be entered. The only other way to exit the data logging menus is to press <RESET> .
However, this will be recorded as an activity, whereas using the exit menu will not.
ENTER MENU SELECTION
__ __
04:30:02
At this prompt input a 3 and press <ENTER>. The unit will execute
a warm start and return to the SAMPLER READY prompt.
Download Menu
The download menu is intended to allow the operator to make either a hard copy (by sending the information
to a printer) or an electronic copy (by sending the information to a PC or a Data Transfer Unit). The
information is in ASCII format and is comma delimited for easier interface with commercially available
spreadsheet programs. The Baud Rate is fixed at 9600 with 8 bits no parity and 1 stop bit. The download
menu is identical to the VIEW menu. The only difference is that when the data is reviewed, it is also being
downloaded to the device of choice.
ENTER MENU SELECTION
__ __
04:30:02
At this prompt input a 4 and press <ENTER>
# OF EVENTS = __ __ __
04:30:02
Shows the operator the number of events recorded. The sampler
holds a total of 512 events. This is a momentary display (3 seconds).
ENTER THE START #
04:30:02
The operator is then prompted to enter the point (event #) at which
they want to begin the display of recorded events. Input the starting
point as a 3 digit number and press <ENTER>
ENTER THE COUNT #
__ __ __
04:30:02
The user is then prompted to enter the number of events they wish to
view. Input the number of events to be viewed as a 3 digit number
and press <ENTER>. This feature allows the user to view all the
logged events, a section of the logged events (300 to 400 for
example), or a single event.
Exit Menu
Summary of Contents for YB8
Page 2: ......
Page 4: ......
Page 22: ...INSTALLATION AND OPERATION MODEL YB8 April 1999 Manning Environmental Inc Page A 12...
Page 30: ......
Page 61: ...MODEL YB8 PROGRAMMING SECTION April 1999 Manning Environmental Inc THIS PAGE BLANK...
Page 90: ......
Page 106: ......
Page 108: ......
Page 119: ...9 YB8 Sampler Theory of Operation Figure 8 YB8 Sampler Block Diagram...